Telstra Sydney 500 V8 Supercar Track
Project description:
Each year Abergeldie installs temporary bridges, barriers and fences and makes modifications to the roads around Sydney Olympic Park to enable staging of the Telstra Sydney 500 V8 Supercar race. Scope includes provision, installation and any required running maintenance of the temporary infrastructure needed during the three day event. At the conclusion of the event, all temporary track infrastructure is removed and placed in storage, and the Sydney Olympic Park precinct returned to its original state.
Complex Challenges:
All work is carried out within a short time window, with tight tolerances.| Division: | Engineering |
| Client: | Integrated Event Delivery Management |
| Current Status: | 95% |
| Start Date: | Oct 2011 |
| Construction Period: | 2 months annually, prior to 4/ 5 December 2010 - 2015 |
| Contract Type: | Lump Sum |
| Value: | $ 10.4 million |