Loganholme
Project description:
Belt Filter Press
Design, supply, install and commission a new belt filter press and gravity drainage deck. Complex Challenges:
The design provided by the client was incomplete, requiring Abergeldie’s in-house design team to develop the system concept further and confirm the client’s agreement to a detailed layout for the new plant.Works were carried out on a brownfield site adjacent to operating systems, requiring close attention to safe work methods and careful scheduling of work and cut-ins to prevent interruption to continuous plant operation.
| Division: | Water |
| Client: | Logan City Council |
| Current Status: | Complete |
| Start Date: | June 2010 |
| Construction Period: | 16 Weeks |
| Contract Type: | Lump Sum |
| Value: | $ 0.35 million |
| Consultants/designers: | CH2Mhill |